看词语>英语词典>hanging basket翻译和用法

hanging basket

英 [ˌhæŋɪŋ ˈbɑːskɪt]

美 [ˌhæŋɪŋ ˈbæskɪt]

n.  吊花篮; 吊花盆

牛津词典

    noun

    • 吊花篮;吊花盆
      a basket or similar container with flowers growing in it, that is hung from a building by a short chain or rope

      柯林斯词典

      • (通常用来展示植物或存放水果蔬菜的)挂篮,吊篮
        Ahanging basketis a basket with small ropes or chains attached so that it can be hung from a hook. Hanging baskets are usually used for displaying plants or storing fruit and vegetables.

        双语例句

        • This paper focuses on the Shao Jiang Bridge and choose the better hanging basket. This paper introduced key continuous prestressed concrete beam bridge construction technology, and gives the reasonable approach about the main issues in the construction process.
          本文以新邵资江二桥为工程背景,选择了经济合理的挂篮形式,介绍了预应力混凝土连续梁桥关键的施工技术,并对出现的主要问题提车了合理的处理方法。
        • For the cantilever triangle hanging basket, the structural analysis of the mathematical model according to the force characteristics and node structure by its form, the space bar element model and the spatial beam element model are mainly studied.
          对于悬臂浇筑三角挂篮来讲,结构分析的数学模型根据它的受力特点和节点构造形式,主要研究其空间杆单元模型和空间梁单元模型。
        • Based on the modal analysis, study the displacement response of hanging basket under the condition of the harmonic excitation in order to get the harmful resonant frequency. This provides the basis for further optimization design and construction safety measures.
          在模态分析基础上,研究挂篮在简谐激励作用下的位移响应,得到挂篮的共振危害频率,为进一步的优化设计和施工安全措施提供基础。
        • Hanging basket with wire feeder and wire set, and electrical control of take-off and landing.
          用吊篮悬挂送丝机和焊丝盘,并用电动控制升降。
        • On hanging basket construction in Ji-Shao express highway Fengshi river super-large Bridge in He'nan
          河南济邵高速公路逢石河特大桥挂篮施工
        • While the loads caused by extreme construction, such as Casting error and hanging basket falling off, should also be controlled.
          同时施工阶段的极端施工荷载,如浇筑误差和挂篮脱落等,也是施工过程中应控制的因素。
        • Discussion on Experimental Method for Loading of Large-tonnage Construction Hanging Basket
          大吨位施工挂篮加载试验方法的探讨
        • The hot-air balloon consists of the bag, the hanging basket and the heating device.
          热气球,由球囊、吊篮和加热装置三部分构成。
        • The design and checking calculation of rhombic hanging basket
          菱形挂篮设计与检算
        • The hanging basket and wet concrete weight are considered as the concentrated force acting on the front construction beam.
          将挂篮和浇筑混凝土梁段湿重视为按挂篮传力作用于前一施工梁段上的集中力作用。